Hyundai Steel shut down its electric furnace-power plant after 15 years
Hyundai Steel shut down its electric furnace-power plant after 15 years
  • 류기헌 기자
  • 승인 2020.06.03 10:42
  • 최종수정 2020.06.03 10:37
  • 댓글 0
이 기사를 공유합니다

현대제철 당진제철소 전경. 사진=현대제철 제공<br>
현대제철 당진제철소 전경. 사진=현대제철 제공

[Infostock Daily= Reporter Ryu Ki-Heon] Hyundai Steel has stopped operating a thin-plate hot-rolled plant in Dangjin Steelworks on 1st.

Hyundai Steel's production of thin-plate hot-rolled plant has stopped once in 2005, 15 years ago. The annual production capacity of thin-plate hot-rolled plant is 1 million tons, which is about 4.2% of the total production capacity (24 million tons).

Seah Besteel also has a plan to reduce the production of four electric furnaces at the Gunsan plant from the first week of June. The company is considering whether to shut down some of the four electric furnaces or reduce production by adjusting the amount of raw materials. Total scale of production cut has not been decided yet.

Dongkuk Steel has already adjusted its production volume flexibly since the end of last year.

 

Reporter Ryu Ki-Heon okyou93@infostock.co.kr


댓글삭제
삭제한 댓글은 다시 복구할 수 없습니다.
그래도 삭제하시겠습니까?
댓글 0
댓글쓰기
계정을 선택하시면 로그인·계정인증을 통해
댓글을 남기실 수 있습니다.